JNV Kannauj

(Ministry of HRD,Dept Of Education,Government of India)

CBSE Affiliation Number:

Current Time :

Today Date : 23-09-2017

Infrastructure

1.

Free Boarding and Lodging.

2.

Free education in pollution free atmosphere.

3.

Free books, stationeries, uniforms and daily use items.

4.

Science and commerce streams at +1 and +2 levels.

5.

Well equipped laboratories for Physics, Chemistry and Biology.     

6.

Fully equipped computer lab. with 36 no. of  PCs, LCD projector and  LAN with broad band internet facilities through V-SAT.

7.

Rich library with sufficient no. of books, periodicals and news papers.

8.

Well managed playground with facilities for various games and sports.

9.

Well equipped M.I. room to provide first aid to sick students.

10.

Galaxy of learned teachers to provide quality teaching and guidance.

11.

Well equipped mess with a dining hall to cater over 500 students.

12.

Power back up facilities to hostels through generator.

 

            STATUS OF INFRASTRUCTURE IN JNV’S

 

 

I

Area of land  allotted (in acres)

 

Whether land transferred in the Name of Samiti

 

Vidyalaya shifted to permanent buildings on

 

 

:32 ACAR

 

:STATE GOVT.

 

 

:2007

 

ii

Status of Boundary Wall

 

a.  Brick Wall

b.  Barbed wire fencing

 

 

: (Completed )

 

iii

Permanent buildings constructed

 

 

: (CBRI pattern/ CPWD pattern)

 

iv

School building

 

 

 

: Complete

 

v

Dormitories

:  Boys _02  Nos.

   with Warden Residence___04 Nos.

 

 

 

 

:  Girls ____01  Nos.

   with Warden Residence_02 Nos.

 

 

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

 

 

:  Complete

 

vii

Principal Residence

 

 

:  Yes.

 

viii

Staff Quarters

 

 

 

 

: Type III = 16 Nos.

  Type II =  04 Nos.

  Type  I  = 08 Nos.

  SP Sheds converted into Staff Qrs.:06 Nos.

 

ix

M.P. Hall

 

: Not available

x

Workshop

 

: Not available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

 

: Shaft type / Column based

 

:  _______ litres

 

: Working satisfactory /

xii

U.G. tank

 

Its capacity

 

Present Status

 

 

:  _______ litres

 

: Working satisfactory /

xiii

D.G. Set

 

 

 

 

:  Available

: JEKSHON make

:   25 KV

: Working

: Year of procurement-2007

 

xiv

Sewage Pump

 

: ________ H.P.

xv

Water Pump

 

 

: ________ capacity

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average.

 

 

 

 : Urban Feeder

:  Complete

: 60 Nos. of Poles

 

: App. 18 hrs.

  

xvii

Playfields

 

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 

 

: Available

:  01 Nos.   –  not available

:  01 Nos.   – Available

 

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

 

 

:   01  Nos.-  working

:  06  Nos.-  working

:  06  hours supply in a day

xix

Rajiv Gandhi Smriti Van

 

:  Available

xx

Fire fighting arrangement

 

:  Working

xxi

Last date of cleaning of

  1. Septic tank
  2. Water tanks

 

:May 2016

:May 2016

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

:   Yes

xxiv

Works taken up under M&R fund during current year and last year:-

 

:03 Lac.

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

2015-16

White wash& Furnisher Repair

2.86

2015-16 1.26 lacs.

           

 

24.

Details of vehicle provided to the Vidyalaya

 

(i)

Whether vehicle is provided or not (Yes/No)

 

Yes ( Sansad , Kannauj-Sh. Akhilesh yadav Present C.M-U.P Govt.

(ii)

Description to vehicle.

 

-

(iii)

Model no and date of purchase.

 

2006

(iv)

Present condition of the Vehicle.

 

 

working